Our bathroom in the hands of two destructive men and a baby.
And the end of day 1 was through. And it was good.
Then day 2 and 3 came. (Sigh.) Nothing worked right. Some sub-floor had to be replaced because of water damage. The pipe work went in fine with some assistance from a neighbor, but then had to be re-done when the measurments did not work. Then, the tub was assembled and brought into the garage to dry from the snow, only to find that it has a defect and has to be returned. The end of day 2 left it looking almost the same as day 1, and day 3 might be the same.
More to come!